COORDINATION AND SUPPORT OF BIM PROCESSES

With our knowledge and experience we support investors, general contractors and design studios on different stages of the investment process. Investors can count on professional service of the entire investment. Designers, however, with our support wil perform a given order faster, eliminating errors in the documentation.

 What can we offer?

IMPLEMENTATION OF STANDARDS

We lead projects on the basis of standardized information management system. We use among others the British and Scandinavian patterns.

COORDINATION OF MODELS EXCHANGE

Thanks to the OPEN BIM co-operation between professionals that use any BIM software is possible. We make sure that this cooperation is working well.

CHECKING THE ACCURACY OF MODEL

The high quality of model is crucial for the success of BIM design. We make sure all parts are properly modeled.

DESIGNING VIRTUAL MODEL

We cooperate with investors in terms of modeling from conceptual design to executive. Our Models are widely used: from marketing purposes to construction management.

BIM model at every stage of the investment

CONCEPT BIM PROJECT

Based on the model developed during the inventory, three-dimensional architectural concept is developed. It is the basis of both marketing materials, as well as a number of reliable quantitative statements, estimates, analysis (of sunlight, energy) and so on. BIM model gives a more complete picture of the plan of architects, and also allows for faster design changes while maintaining the cohesion of all elements of the documentation. This allows you to better develop the functional-spatial concept.

BIM VISUALIZATION

We offer a full visualization service consisting of virtual BIMx walks, static images of the exterior of the building, axonometric views of individual floors with exposed ceilings and interior renderings in iVisit 3D technology.

CONSTRUCTION PROJECTS

Construction drawings can also be obtained directly from the BIM model. We use a system developed by us to minimize the amount of work required to enter information in a construction project. Thanks to that each piece of information is added only once. As a result, documentation is always internally consistent, not only in terms of drawings (BIM model feature), but also text information. Depending on the time which is intended for the construction project, it may have the features of multi-discipline BIM model object. This means that already at the design stage, you can predict the number of conflicts, such as for example collisions of components and the installations. Our priority is, however, the date of submission of the necessary documents in offices.

COMPREHENSIVE IMPLEMENTATION PROJECT

This stage involves enrichment of model for the information needed to carry out the construction. All constructions components are modeled, cubature installation elements and breakthroughs, both in existing tissue of building, as designed elements. Thanks to that model it is possible to avoid conflicts and collisions on site, as well as obtain real quantitative data. This model is a set of information that allows you to erect a building. Its content can be expanded during construction. The model allows for obtaining 2D drawings.

ANALYSIS, SCHEDULES, ESTIMATES – BIM 4D, 5D, 6D

A three-dimensional model of the planned investment is a source of reliable information that allows to automatically perform a series of analyzes such as an estimate of energy, takeoff, or work schedule. Tools allow you to effectively use the various information contained in the BIM model. We work with specialists in various industries, including LEED certified specialists, BIM experts or estimates. We use their knowledge and experience in the analysis of the BIM model in terms of energy efficiency, or their use for oing takeoff and scheduling.

BIM MODEL IN REBUILD PROJECT

ENRICHMENT OF MODEL

We refine and add relevant information to BIM model, for eg. data from the technical expertise or architectural conservation study. All important information is assigned to the individual elements of the virtual building and can easily be used in next stages of design and implementation.

STAGES OF RECONSTRUCTION

During the design work status of reconstruction is assigned on all elements: an existing element (to keep), for demolition or designed. As a result, we can easily graphically model the different stages of remodeling.

.

ALL ABOUT OBJECT IN MODEL

The virtual building is the source of all relevant information about the project. On it’s basis technical drawings are developed, juxtaposition to takeoffs and estimates, as well as visualizations and marketing materials. All elements of documentation are generated from the model, so they are always consistent and the data contained therein are certain.

OUR RECENT PROJECTS

Grand Master's Palace in the castle in Malbork

BIM model of Kielce Bus Station

Facades of office building for bill of quantities

Complex of former factory of Ludwik Geyer in Łódź

Shopping center in Bopfingen

BIM model and documentation for building permits and estimate budget of work